PRODUCTS > Batten Roll Forming Machine C75

Batten Roll Forming Machine C75

1(43).jpg
  • 1(43).jpg
  • 2(42).jpg
  • 3(39).jpg
  • 4(39).jpg
  • 5(37).jpg
Batten Roll Forming Machine C75/C75 Steel Stud Roll Forming Machine/C75 Ceiling Making Machine is used for producing steel batten and stud for ceiling usage.

PAYMENT:T/T,L/C,CASH

LEAD TIME:2~3Months

WAY OF PACKAGING:Nude place in container, machine body tightened with steel wire rope and base frame position fixed by heavy steel angle plate. Roller groups cover with waterproof cloth. Computer control system packed with plywood box. Tooling box and regular wearing parts packed with plywood box as well.

ADVANTAGE FEATURES:1.De-coiler storage steel coils and smoothly feeding into forming machine labor save operation. 2. Forming, Punching & cutting at any required length with pre-set quantity automatically. 3.The encoder will record signal feedback and showing exact length of product on display. 4.The total length of finished coil is able to calculate via control panel. 5.Steel rollers are fabricated by CNC precision machine and hard chrome coated. 6.Cutting blade material is Cr12/Cr12Mov (D2/D3) fabricated by CNC machine, heat treatment. 7. Hydraulic system will equip cooling system to keep low temperature during long time continuously in one day.


Description:


Batten Roll Forming Machine C75/C75 Steel Stud Roll Forming Machine/C75 Ceiling Making Machine:

It can be made as per desired requirements and can be fabricated from various material thicknesses and in almost any length. With highly punching accuracy, accurate dimension forming automatically and cut to length, the forming line capable well improved customer production capacity. 


Reliance offer on-site installation, training and maintenance if have demand.

Working Procedure:

Uncoiling– Roll Forming Machine– Cutting– Collecting


Technical Details:


The Line’s Specifications

Weight

About 3500kgs

Whole line’s dimension

About 7m x 1m x 1.2m (length x width x height)

Color

Main color: blue


Warning color: yellow

Suitable Raw Material

Material

Galvanized or Galvalume Coils

Thickness

0.75-1.2mm

Coil feeding width

161mm

Yield Strength

350~550Mpa

Main Technical Parameters

Quantity of forming rollers stations

About 12

Diameter of forming rollers shafts

75mm

Roll Forming Speed

18m/min

Production Speed

8m/min

Forming rollers material

ASTM 1045, hard chrome coated

Cutter material

Cr12 mould steel, with quenched treatment

Controlling system

Combined with: PLC (Siemens), Touch Screen (Siemens), Inverter (Schneider), Encoder (Omron), etc

Electric Power requirement

Main motor power: 7.5kw


Hydraulic unit motor power: 4kw

Electric voltage

According to customer’s requirement

Main Components

Decoiler (manual and automatic for options)

1 set, 3Ton*600mm

Roll Forming system

1 set

PLC control box

1 set

Hydraulic unit

1 set

Run outs tables

1 set


c75 ceiling making machine:

11(37).jpg

c75 light roll forming machine:

22(30).jpg

c75 stud And C75 Galvanized C Stud:

33(27).jpg

Advantage Features:

Forming and cutting at any required length with pre-set quantity automatically.

The encoder will record signal feedback and showing exact length of product.

The total length of finished coil is able to calculate via control panel.

Steel rollers are fabricated by CNC precision machine and hard chrome coated.

Cutting blade material is Cr12/Cr12Mov (D2/D3) fabricated by CNC machine, heat treatment.

Hydraulic system will equip cooling system to keep low temperature during long time continuously in one day.


Why Choose Us:

Original manufacturer with prompt directly service support.

Professional and deep experienced in customized roll forming field.

Reasonable price with qualified, reliable, humanization design and solutions.

We sincerely treat customer as friend and build lasting relationship.

Packaging Details:

Nude place in container, machine body tightened with steel wire rope and base frame position fixed by heavy steel angle plate. Roller groups cover with waterproof cloth. Computer control system packed with plywood box. Tooling box and regular wearing parts packed with plywood box as well.

Loading Port: Xiamen Port, China

Machine Leading Time: 70~90 Days

44(21).jpg